Ioncore Platform Update & Fundraising Model

Back to Home Request Data Room
Round: $32M Growth Round
Instrument: Preferred Equity w/ 1x non-participating
Pre-Money Valuation: $138M
Minimum Check: $750k (lead sought at $10M+)
Why Now

As of May 2026, demand for resilient, zero-emission backup is accelerating across healthcare, AI data infrastructure, and high-load facilities. Ioncore’s magnetic inertia platform pairs battery-speed response with turbine-grade lifespan, positioning the company as a modern critical-power alternative where downtime is unacceptable.

Executive Summary

Platform Status — May 2026

Commercial Readiness

Core hardware is out of pure R&D and in structured customer deployment with formal SLA tracking.

Software Layer

Monitoring, alerting, and remote performance analytics are now productized for operator and investor reporting.

Scale Readiness

Supply-chain and manufacturing playbooks are being standardized to support repeatable multi-site rollouts.

Vision & Mission

Build the most trusted platform for resilient clean power by commercializing modular magnetic inertia systems for facilities that cannot fail.

Value Proposition

Fundraising Ask

Investment Snapshot

Customer Pipeline

18 qualified deals (>$72M TCV) across healthcare, data centers, logistics, and EV charging—7 in commercial negotiation.

Unit Economics

Blended 44% gross margin on initial commercial runs; path to 57% through supplier consolidation and assembly automation.

Resilience Advantage

Sub-1 ms response + 20-year design life yields >30% lower TCO vs. lithium for critical-load backup scenarios.

Climate Impact

Each MW replaces ~1,200 tons CO₂ annually versus diesel, supporting Scope 1 reduction targets and ESG procurement mandates.

Traction & Milestones

DateMilestone
Q1 2024Completed lab-scale prototype testing (99% round-trip efficiency)
Q3 2024Secured first Letter of Intent (LOI) from a major hospital chain
Q1 2025Demonstrated continuous 48-hour off-grid operation in pilot site
Q2 2025Filed two additional patents on cooling and control algorithms
Q4 2025Commissioned first 250 kW commercial installation and launched paid leasing pilot
Q1 2026Expanded to three live customer sites with remote monitoring and SLA reporting
Q2 2026Entered certification validation phase and initiated regional partner onboarding

Market Analysis

Total Addressable Market (TAM)

Serviceable Obtainable Market (SOM)

Current focus (2026–2028): North American healthcare + data centers + critical commercial real estate (~USD 7 billion).

Customer Personas

Competitive Matrix

FeatureMagnetic InertiaLithium-Ion BatteriesFlywheelsDiesel Generators
Round-Trip Efficiency98–99%85–90%85–95%N/A
Cycle Life> 50 000 cycles~ 3 000 cycles~ 20 000N/A
Carbon EmissionsZeroLow (manufacturing)ZeroHigh
Maintenance Interval5 years1–2 years3 years6 months
ScalabilityModules to MWModules to MWLimitedUnlimited

Product Description

System Architecture

Key Benefits

Use Cases

Deployment Playbook

Rapid Pilots

90-day pilot template with pre-engineered interconnects and remote monitoring to prove ROI fast.

Financing Flexibility

Blend of capex sales, PPAs, and energy-as-a-service, letting customers choose opex vs. capex.

Scalable Stack

Standardized 100 kW blocks networked via microgrid controller; MW-scale deployments in weeks.

Business Model

Revenue Streams

Pricing Illustration

ModelCapacityPurchase PriceLease PPA Rate
Residential100 kWUSD 120 000USD 2.50/kWh over 7 yrs
Commercial Small250 kWUSD 280 000USD 2.20/kWh over 10 yrs
Data Centre1 MWUSD 1 millionUSD 1.80/kWh over 10 yrs

Capital Efficiency Logic

Marketing & Sales Strategy

Brand Positioning

“The world’s cleanest, most reliable energy storage.” Leverage case studies and performance data to build credibility.

Go-to-Market Phases

  1. Phase 1 (Completed in 2025): Pilot installs with LOI customers and operating-data publication.
  2. Phase 2 (2026): Revenue conversion from pilots, partner onboarding, and channel-led expansion.
  3. Phase 3 (2027+): Cross-border licensing and multi-region deployment at MW scale.

Operational Plan

Manufacturing

Supply Chain

R&D Roadmap

Funding Timeline & Catalysts

  1. Q2 2026 (Current): Final diligence with lead investors and project-finance partners.
  2. Q3 2026: Close growth round and expand manufacturing cell capacity.
  3. Q4 2026: Convert active pilots to long-term service and lease agreements.
  4. 2027: Launch OEM licensing program and target 55%+ gross margin.

Investor Alignment

Governance

Quarterly board with climate/infra expertise; independent seat reserved for lead investor.

Reporting

Monthly KPI pack covering uptime, backlog conversion, burn, and cash runway; portal access for LPs.

Compliance

ISO 9001 manufacturing in process; UL 9540 + CE/CSA roadmap underwritten by third-party labs.

Financial Plan

Use of Proceeds

CategoryAmount (USD)% of Raise
Manufacturing Scale-Up4 000 00040%
Pilot Project Deployment2 000 00020%
R&D & IP Protection2 000 00020%
Sales & Marketing1 500 00015%
Working Capital500 0005%

5-Year Financial Projections

Revenue: USD 50 million
EBITDA margin: 25% by Year 5
Break-Even: Mid-Year 3

Capital Deployment Roadmap

Manufacturing

Automate rotor balancing and stator winding to double throughput while holding workforce flat.

Pilots to Recurring

Convert 4 paid pilots into 8-year PPAs; target 75% conversion through performance guarantees.

IP & Moat

Expand patent family to include control firmware and thermal topologies; initiate trade-secret program.

ESG Impact

Intellectual Property & Regulatory Strategy

Team & Advisors

Leadership

Advisory Board

Investor Opportunity & Exit Strategy

Return Drivers

Exit Pathways

Risk Analysis

Risk CategoryMitigation
TechnologyRigorous pilot validations; third-party testing partnerships.
Market AdoptionEarly adopter incentives; strong case-study evidence; referral discounts.
Supply ChainDual-sourcing; buffer stock; long-term supply contracts.
RegulatoryEarly engagement with cert bodies; dedicated compliance team.

Appendices & Next Steps

Ambassador & Partner Grants Program

We have moved the full grants application portal into a dedicated page for easier submission workflow, expanded eligibility guidance, and richer project-scoping tools.

Apply Now

Use the dedicated portal to choose your grant track, upload milestones, model your deployment impact, and submit your full proposal packet.

Ioncore Energy Ioncore Energy Magnetic Inertia Systems